Page 17 - Abu Dhabi Oil Co Ltd. (Japan) - Sustainability Report
P. 17

ADOC 2022 SUSTAINABILITY REPORT


            Hail Site Terminal and Field



               Hail Field is located 10 kilometers south of Mubarraz
               Island. The Hail Field development project is planned
               in two phases: Early Production Scheme Phase and
               Full  Field  Development  Phase. The  Early  Production
               Scheme was commissioned and started production
               in late 2017.  The Hail  Site  Terminal (HST) was
               constructed  as  part  of  the  early  production,  and
               includes  production  wells,  well  testing  facilities,
               production pipelines, gas injection and gas lift pipeline,
               subsea cable lines, chemical injection, and other utility
               systems. Fluid produced from Hail Field is transferred   provides  important  coral  and seagrass  habitats  for
               via pipelines to Mubarraz Island for processing.  Dugongs (Dugong dugon – Vulnerable (VU) by the

               Mubarraz Island, AR & GA Field and Hail Field are   International Union for Conservation of Nature and
               located  within the Buffer Zone of the Marawah   Natural Resources (IUCN)) and other marine wildlife,
               Marine Biosphere Reserve. The biosphere reserve   including sea turtles and dolphins.



             Rig Operations





               We use jack-up type offshore rigs that are designed to
               operate in the shallow waters. The rig possesses a barge-
               shaped  hull with  three legs  and  is  also  equipped  with
               a derrick  and other devices  for drilling and workover
               operations. The jack-up rig is towed to a location with its
               legs positioned upwards. Once reached at the designated
               site,  the  legs  are  firmly  positioned  on  the  seabed  for
               workover or drilling operations.




            Mubarraz Island



               Crude oil from the Mubarraz, AR, GA and Hail Fields is
               gathered  through pipelines at Mubarraz Island, where
               facilities are used to process the crude oil into the final
               crude product, and loading facilities are used for shipment
               to Japan through a Single Point Mooring (SPM) facility.
               Produced water at Mubarraz Island is injected into the
               underground  formation  through disposal  wells.  The
               island also hosts a residential facility that accommodates
               approximately 500 personnel, and provides sports and
               recreation facilities, including a soccer field, tennis court
               and golf course.






                                                                                                                  17